Daytime Noise Monitoring Results -- Normal weekday          
Station M8, Wah Lai House                    
Date Start Time End Time  Weather Noise level (dB(A)), 30 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
04-Oct-10 13:53 14:23 Sunny 66 68 63 Grouting works and pipe piling Road Traffic noise from Shek Pai Wan Road. N.A 25.5 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2656516
14-Oct-10 13:47 14:17 Sunny 65 66 63 Pipe piling Road Traffic noise from Shek Pai Wan Road. N.A 27.9 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2656516
21-Oct-10 15:17 15:47 Sunny 65 67 62 Pipe piling Road Traffic noise from Shek Pai Wan Road. N.A 25.5 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2656516
28-Oct-10 10:33 11:03 Sunny 66 68 64 Pipe piling Road Traffic noise from Shek Pai Wan Road. N.A 18.7 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2656516
00-Jan-00 - - - - - - - - - - - - -
00-Jan-00 - - - - - - - - - - - - -
      Min. 65                
      Max. 66